Research Reports


Japan Earthquake and Electrical Brownouts to Affect Silicon Wafer Supply and Glo

Research Reports

icon

Last Update

2011-03-16

icon

Update Frequency

Aperiodically

icon

Format

PDF

icon

Membership

  • History Report


    Report Overview

    Based on the survey conducted by DRAMeXchange, a research division of TrendForce, due to Japan earthquake, Fukushima No. 1 power generator was shut down and caused a radiation leak, which led to an electric power cut in northeast Japan. Since March 14th, Japan started to enforce electrical brownouts among areas with less damage, and made electrical usage concerning transportation and daily life the first priority. There is still no definite time on when electricity will be restored in Miyagi and Fukushima, where the earthquake caused serious damage...

    Analysts

    Ken Kuo

    Avril Wu




    History Report Related Reports



    Server DIMM Price Dec. 2013

    2013/12/31

    DRAM

     PDF

    According to DRAMeXchange, a research division of TrendForce, with shipments for the holiday sales season weaker than in previous years, the server DRAM contract price trend...

    Specialty DRAM Price Dec. 2013

    2013/12/31

    DRAM

     PDF

    According to DRAMeXchange, a research division of TrendForce, the December specialty DRAM price trend...

    SK Hynix’s Wuxi Fab to Recover Fully from Fire Damage by Mid-January 2014

    2013/12/11

    DRAM

     PDF

    According to DRAMeXchange, a division of global research firm TrendForce, damages from the September 4 fire at SK Hynix’s DRAM fabrication plant in Wuxi, China caused a month-long cease in production, and global DRAM supply decreased by 10% in one single month...




    Membership





    Category