News

[News] TSMC Reportedly Begins Small-Scale Production in Arizona for Apple’s A16 with the N4P Node


2024-09-19 Semiconductors editor

In early September, rumors have it that TSMC’s first US fab in Arizona began producing engineering wafers using the 4nm process in April, with yields reportedly comparable to those manufactured in its Southern Taiwan Science Park facility. Now here’s the latest update: the fab has started trial production for Apple’s A16 chip, according to a report by MoneyDJ.

The report notes that the mobile processors are manufactured with TSMC’s 5nm, or the so-called N4P node, which is the same as the node used in Taiwan to manufacture A16. The N4P node is actually a member of the 5nm family, as it is regarded as an enhanced version of 5nm, the report explains.

It is worth noting that Apple’s A16 SoC, though launched two years ago with iPhone 14 Pro, is considered as one of the most advanced mobile chips for the company, as the chip is also be seen in iPhone 15 and iPhone 15 Plus models. MoneyDJ indicates that the move marks a milestone that instead of beginning with some less critical chips, Apple and TSMC intend to aim high from the start.

According to the report, Apple’s A16 is currently being trial-produced at TSMC Arizona’s “Fab 21” Phase 1 facility, with a small production volume. However, once the second stage of the Phase 1 fab is completed, the output will significantly increase.

TSMC plans to build three plants in Arizona, each with cleanroom spaces twice the size of typical logic fabs in the industry. The first fab is expected to begin mass production in the first half of 2025.

TSMC’s second fab in Arizona will use 2nm process technology to meet strong AI-related demand, with production expected to begin in 2028. The third fab will employ 2nm or even more advanced process.

However, the situation for Samsung’s investment in the U.S. would be a different story. A previous report from Korean media outlet Business Korea noted that persistent issues with its 2nm yield rate have led Samsung to decide to withdraw personnel from its Taylor, Texas plant, signaling another setback for its advanced wafer foundry business.

As for Intel, which proactively pursues the support of the U.S. government, it is holding steadfast on its investments in the country despite recent announcements to spin-off its foundry business and delaying the projects in Germany and Poland for two years.

Intel plans to invest USD 100 billion over the next five years in new fabs and expansions across Arizona, New Mexico, Ohio, and Oregon, creating 10,000 manufacturing jobs and 20,000 construction jobs.

Read more

(Photo credit: Apple)

Please note that this article cites information from MoneyDJ and Business Korea.

Get in touch with us